Project overview
Concrete Repair Solutions were appointed to undertake targeted concrete repair and corrosion control works to Fort Road Bridge in Tilbury, Essex.
The scope focused on the North Abutment, where areas of deteriorated concrete and reinforcement corrosion required controlled removal, treatment, installation of galvanic protection, and reinstatement using spray-applied repair systems.
The works formed part of a durability-led intervention to reinstate structural integrity and mitigate ongoing corrosion risk within a live bridge environment.