Project overview
Concrete Repair Solutions were appointed to carry out a structural repair to a damaged concrete floor rib at the Sherrington Building, University of Oxford, during the building’s refurbishment.
Reinforcement in one of the ribs of the clay pot floor slab had been severed, so the rib needed to be strengthened and rebuilt. Working to the structural engineer’s design, our team installed temporary propping, reinstated the reinforcement and rebuilt the rib.
The works were delivered within a live refurbishment project, working closely with the main contractor and the engineers.