Project overview
Concrete Repair Solutions were appointed to undertake refurbishment works to an external reinforced concrete fire escape stair serving a multi-storey commercial office building in Reading, Berkshire.
The structure comprised a spiral reinforced concrete stair supported by a central column, with cantilevered concrete treads and an elevated landing protected by a steel balustrade system. Areas of concrete deterioration, coating breakdown and corrosion to exposed metalwork had developed due to prolonged weather exposure.
The scope included localised concrete repairs, refurbishment of the metal handrail system, installation of new deck waterproofing membranes and application of anti-carbonation protective coatings to all exposed concrete elements.