Project overview
Concrete Repair Solutions were appointed to undertake a make-safe façade survey and mastic sealant replacement works to external panel joints at Nuffield Health Cheltenham Hospital.
The scope involved rope access inspection of the building elevations, identification of deteriorated sealant joints, and renewal of mastic sealant to vertical panel joints to maintain weatherproofing and façade integrity.
Works were delivered within a live healthcare environment, requiring careful planning and controlled access.