Opening-Up Works for Structural Investigations: A Guide for Engineers
Concrete Repair Solutions, Specialist Concrete Repair & Structural RefurbishmentRead it in 10 minutes
1200
627
Read it in 10 minutes
A structural engineer can only assess what they can see. Drawings for older buildings are often missing, incomplete or wrong, and the details that matter most (slab bearings, beam to column connections, embedded steelwork, lintels and wall ties) are usually hidden behind brickwork, cladding or finishes. Before an engineer can sign off a building, design a repair or confirm a load path, someone has to open the building up safely, test the concrete, and put everything back. That is the job of opening-up works.
This article explains what opening-up works involve, what engineers typically need exposing, how the work is planned and controlled on an occupied site, and what the engineer receives at the end of it.
Opening-up works (also called intrusive investigation or exploratory works) are the physical works that let an engineer inspect concealed parts of a structure. They are carried out by a contractor, under the direction of the engineer, at locations the engineer selects.
A typical package combines three things: carefully removing brickwork, cladding or finishes to expose the element in question; testing the concrete and reinforcement at and around the opening; and making good afterwards so the building is left weathertight, safe and as close to its original appearance as possible.
The contractor’s role is to expose, test and record. The engineer inspects each opening, interprets the findings and draws the structural conclusions. Keeping those roles clear protects both parties and keeps the investigation focused on what the engineer actually needs to know.
The scope depends on the building and the question being asked, but common requests include:

Opening up a building is disruptive, so it makes sense to gather as much information as possible from each visit. Concrete testing is normally carried out at the same time, at locations agreed with the engineer:
Comparing carbonation depth and the chloride content at reinforcement depth with the measured cover tells the engineer whether the reinforcement is at risk of corrosion, not just whether it is corroding today.
Good investigation work is mostly planning. Before anything is removed, the following should be in place:
Many openings can be kept small enough to need no temporary support. Where a larger opening is needed, for example at a bearing, a connection or a section of loadbearing masonry, the structure must be supported before anything is removed. Temporary works on an investigation are managed in the same way as on any construction project, following BS 5975:
Providing the temporary works alongside the opening-up and testing means a single contractor is responsible for keeping the structure stable from the first brick removed to the last one reinstated.
A typical sequence for a bearing investigation behind brickwork looks like this. The engineer and contractor walk the building and confirm the locations. Non-destructive testing (cover meter, rebound hammer) is completed first, followed by drilling for carbonation and chloride samples. The outer leaf brickwork is then removed by hand at each bearing, with the bricks set aside for reuse. The engineer inspects and records each opening while it is exposed, and any unexpected findings (corrosion, short bearings, missing ties or signs of movement) are reported straight away.
Where an opening must stay exposed overnight, it is covered against the weather, barriered and checked at the end of the day and before work restarts. On occupied buildings, dust is controlled with on-tool extraction, noisy work is kept to agreed hours and walkways, entrances and escape routes are kept clear throughout.
Reinstatement is part of the investigation, not an afterthought. Removed bricks are rebedded once the engineer has finished, in a mortar matched to the existing in colour and compatible in strength, so it is never stronger than the surrounding brickwork (lime-based where the original is lime). Any cavity trays, damp-proof courses, weep vents, wall ties and cavity barriers or fire stopping disturbed by the opening are reinstated. Test holes and cores are filled with a cementitious repair mortar and finished to suit the surrounding surface. A well-executed reinstatement leaves no visible trace and no new route for water or fire through the structure.
Where the openings reveal defects that need repair, the reinstatement can be held until the engineer’s recommendations are known, so the opening can be used for the repair rather than being reinstated and opened up again.
The output of an opening-up package should give the engineer everything they need to complete their assessment without a second visit:
Structural conclusions and the design of any remedial works remain with the engineer. The contractor’s job is to make sure the evidence behind those conclusions is complete, accurate and well recorded.
Opening-up works sit between surveying and construction, and they need a contractor who understands both. Look for a team that can carry out the testing as well as the builders’ work, can provide and manage any temporary works, works safely on occupied sites, follows the engineer’s direction through hold points, and can also deliver the concrete repairs or strengthening that may follow. Using one contractor for the investigation and the repair means the people who opened up the building already know it when the remedial works start.
Who decides where the openings go?
The structural engineer. The contractor marks the agreed locations on plan and on site, checks them for services, asbestos and stability, and raises any location that cannot be opened safely so the engineer can choose an alternative.
Can the building stay occupied during opening-up works?
Usually, yes. Work is carried out in small barriered areas, one location at a time, with dust extraction, agreed working hours and entrances, walkways and escape routes kept open throughout.
Do opening-up works need temporary works?
Not always. Small openings in non-loadbearing cladding often need none. Larger openings, or any opening in loadbearing masonry or at a bearing, need temporary works designed, checked and signed off under BS 5975 before work starts.
How long do opening-up works take?
A typical package of a handful of openings with associated concrete testing takes one to two days on site, with openings left covered overnight while the engineer inspects them. Laboratory results for chloride and core testing follow afterwards.
Can the same contractor carry out the repairs?
Yes. Where the investigation finds defects, the contractor who opened up the building can deliver the repairs to the engineer’s specification, and openings can be left for the repair rather than reinstated and opened again.
An engineer’s assessment is only as good as the information behind it. Well-planned opening-up works give engineers direct sight of the details that matter, backed by recognised concrete tests, while keeping the building safe, occupied and weathertight.
CRS carries out opening-up works, temporary works, concrete testing and making good for structural engineers across the UK, as part of our structural investigation service. If you have a building that needs opening up, get in touch with the CRS team.
Contact us for a professional consultation and detailed quote
Contact us Call usContact us for a professional consultation and detailed quote
Contact us Call us